PercepxiON · Prototypes

Two buildings, read before they exist.

Two studio studies, each with a real brief. Every number is worked out live, and you can re-run it.

01

Studio study · library

A small library, read before it exists.

A six-room library designed by the studio, then read room by room. Turn it, pick a sense, and compare before and after the six changes.

Barcelona · 41.4°NSite as briefed
LibraryBuilding type · sets the weights
Concept stageEverything can still move
6 rooms · 1 routeThe route from the pilot protocol
55 → 70Average score, before and after
LowHighAverage score 55

Drag to turn · click a room to hold it

WHAT THE READING FOUNDFive things a competent specification hid

01 6.06s Reverberation in the foyer · target 0.6–0.9 s

The foyer is a cathedral by accident.

Problem
A tall hall of stone and plaster. Twenty people talking have to raise their voices. Calm in a photo, tiring in use.
Fix
Soften the walls, not the ceiling: in a room this tall, the walls are the bigger surface. That alone fixes the echo.

Sabine T60 on 864 m³ · clarity index 7 · dimension 02

49 → 72
02 0.14 Winter circadian dose, north-facing · threshold 0.30

The best palette, under the wrong light.

Problem
Oak, timber and a view of trees score well. But warm oak under warm light feels tense, and north windows give too little winter light.
Fix
Sage walls and a slatted ceiling raise it to 80. Turning the windows east, early on, raises it to 87.
Noted
A high ceiling suits big-picture thinking more than focus. Noted, not changed.

Solar geometry and circadian stimulus · pigment × illuminant · body-scaled prime · dimensions 03, 06, 09

69 → 87
03 43 The corridor, lowest room in the building

The worst room is the one nobody designed.

Problem
A low 2.4 m ceiling, a plastic handrail, plain walls, no window.
Fix
Raise the ceiling to 2.7 m and use an oak handrail: 57. Daylight could come from above.
Why
Corridors are the cheapest rooms to improve, because they start so low.

Population sweep over 64 statures · skin-response integral on the rail · dimensions 09, 07

43 → 57
04 4.41 Foyer ceiling ÷ median body · comfortable 1.55

The model learned something, and says so.

What
The tool first marked the tall foyer as badly proportioned, as if a hall were a small room.
Fix
Now it reads tall gathering spaces as generous. The fix is dated 22 September 2026.
Why
Testing on our own designs caught an error before a real project could.

The discrepancy between the dimension 09 model and the foyer · fixed in reading.html

0 → hall
05 1 Sign the building needs · a typical fit-out hangs four

Three readings from the plan, by hand.

Wayfinding
Every room is visible from the door, so only one sign is needed, where two doors face each other.
Circulation
One sharp turn into the corridor. Softening it into a curve costs about 1.2 m of floor.
Feeling
Our prediction: the corridor entrance feels tensest, the reading room calmest.

The plan, read with the methods of dimensions 08, 04 and 01 · not computed

By hand

THE SCHEMESix rooms on one route

Vestibule, foyer, corridor, courtyard, reading room, stair, gallery, a sequence chosen because a study route needs each room to change at least two of light, scale, material and sound from the one before. The plan is drawn to the studio's conventions: black outer walls, grey partitions, door swings, the route as an authored curve through real openings, decision points marked.

Ground floor. Route from the entrance through the foyer and corridor to the reading room; branch to the courtyard. Gallery and meeting room are on the floor above, over the corridor and reading room.
Section developed along the route. Compressed (2.4 m) → released (7.2 m) → compressed (2.4 m, under a normal 3.3 m floor) → settled (3.3 m), with the 4.5 m gallery and the meeting room on the floor above. Figures are the median adult, 1.685 m.

Room schedule, as read

RoomUseW × D × HGlazingCeiling · Walls · FloorTouchedWall colour · Light
VestibuleMove through4 × 3 × 2.4noneplaster · plaster · stonesteelpale grey · 3000 K
FoyerGather12 × 10 × 7.2south, 50%, groundplaster · exposed concrete · stonesteelclinical white · 4000 K
CorridorMove through2.4 × 18 × 2.4noneacoustic tile · plaster · carpetlaminatemagnolia · 4000 K
Reading roomFocus8 × 8 × 3.3north, 35%, ground · treestimber · timber panel · timberoakwarm oak · 2700 K
Gallery (first floor)Gather6 × 16 × 4.5north clerestory, 30% · skyplaster · plaster · timberoakclinical white · 5000 K
Meeting room (first floor)Gather5 × 6 × 2.7east, 30% · builtacoustic tile · plaster · carpetlaminatepale grey · 4000 K

A deliberately ordinary specification. Nothing here is a mistake a practice would be embarrassed by; that is the point. The courtyard is outdoors and is not read as a room.

WHAT I WOULD CHANGEThe cheapest large gain in each room

For each room, the tool picked the single change that gains most for least effort. The average score rises from 55 to 70, mostly with finishes.

RoomMoveNowAfterCost
CorridorRaise the ceiling to 2.7 m · oak on the rail43→57structural · small order
VestibuleOak door furniture · carpet46→54fit-out
FoyerTextile-lined walls · oak handrail49→76fit-out
GallerySlatted timber ceiling50→73fit-out
Reading roomSlatted ceiling · sage walls · main glazing turned east69→87fit-out · concept only
Meeting roomLeft as drawn72→72–
55AVERAGE SCORE, AS DESIGNED
70AFTER THE SIX CHANGES
02

Studio study · design by sweep

A classroom, three thousand six hundred ways.

One classroom, ten decisions: orientation, windows, ceiling height, finishes, colours, lighting and plants. Every version is scored and costed, first with everything open, then with the shape already fixed.

8 × 7.5 m · 28 pupilsOne room, a focus room
SchoolBuilding type · sets the weights
Barcelona · 41.4°NNorth faces the playground trees
3,600 variants2,400 open · 1,200 form frozen
10 decisionsAbout 400 million combinations
0 variants read

Hover a point to see that classroom · click to hold it

…

Appears when the sweep finishes.

…

Appears when the sweep finishes.

…

Appears when the sweep finishes.

…

Appears when the sweep finishes.

What matters most in this classroom

For each decision, how far the mean score moves between its best and worst option across the open sweep.

    Computed

    Every reading: Sabine on the room's volume and finishes, solar geometry and circadian stimulus for the orientation and glazing, the body-scaled ceiling sweep, the raycast material census, colour under the lamp, and the view. The frontier and the ranking of decisions are computed from the sweep.

    Declared

    The costs are the studio's indicative schedule, used to rank the options. The site is declared: trees to the north, buildings on every other side. The option ranges are the studio's.

    Next step

    The sweep picks the rooms worth building as a mock-up. The pilot protocol then reads that mock-up on the children who will use it.

    Next

    Sixteen real buildings, studied independently

    The same models run on published plans, from the Sagrada Família to the Shanghai Tower.

    The studies